[Construction Example] Wall Installation Using SR-45 Original Kelly Grab
We will introduce a case study using our original in-house developed tool, the special Kelly grab.
We would like to introduce a case study of underground obstacle removal conducted by our company. This project took place in Nihonbashi Bakurocho, Tokyo, involving wall-side construction. The site conditions were in a narrow area within the city. Using the SR-45 multi-drill excavator, we carried out the removal of the existing structure, employing our original tool, the special Kelly grab. 【Case Overview】 ■ Project Name: Wall-side construction using the SR-45 original Kelly grab ■ Construction Date: December 14, 2022 ■ Location: Nihonbashi Bakurocho, Tokyo ■ Details: Φ1000 L=3.5m at 15 locations *For more details, please download the PDF from the related link or contact us.
- Company:東京テクノ
- Price:Other